First to understand the needs of the customers, listen to the customer with an open mind.
After-sales Service Technical Help Download News
The stage lighting equipment maintenance?
Release Date:[2016/6/24 16:50:29]   Total read [2776] Times

Light matters needing attention

 

1 and half an hour before the opening, open all equipment, low temperature preheating, test all the equipment and lines at the same time. Low temperature state refers to a dim light can;

 

2, warmed up after fifteen minutes to zero in all equipment, equipment cooling, cooling time not less than 15 minutes;

 

3, after cooling, can be formally entered the stage of music performance;

 

4, the performance, after the guests leave, lighting engineer should shut down all equipment, and make the equipment cooling 15 to 20 minutes, then equipment for storage or mask, juicers before departure.

 

Lighting equipment maintenance is more complicated than the level of sound, is trivial, basically do daily routine detection, regular weekly, monthly equipment maintenance and debugging appropriately;

 

Conventional detection range includes:

 

1, whether or not the bulb light properly;

 

2, all the devices of attachment is normal;

 

3, all the equipment whether can normal use, including light switch, color changer control, motion and so on is normal,

 

4, DMX512 signal whether can normal control lamps and lanterns;

 

5, special equipment is normal use, and fill them with the required materials, such as: machine, fog machine, snow machine, bubble machine, etc.

 

Regular testing

 

Regular testing in addition to routine monitoring all project also note the following points

 

1, in the weeks to detect when the connection to the main test equipment, including power cords, DMX512 cords, etc., and see whether there is loose, whether there is a breakpoint, etc.

 

2, when tested for weeks at the same time, should be more fully adjust the lamp and DMX512 programming;

 

Monthly equipment maintenance and proper adjustment

 

An appropriate adjustment of the every month in addition to routine monitoring and testing of all work a week, it will be a very meticulous work, need to coordinate multiple departments, such as actors, band, weak current, security, cleaning, etc., at the same time in the month test, to complete the following work.

 

1, light adjustment; Because in use there will be a part of the lamp, the change of movement or guest area lead to light changes, so in each month for the adjustment of the equipotential, of course, also include DMX512 signal control amount;

 

2, the testing of mechanical equipment, including the amount of motor, the color changer, special equipment of nozzle, etc.

 

3, check all the lines. To detect whether there is a breakpoint, breakage, leakage, because some human factors is in use to avoid lines appear all sorts of unexpected circumstances, such as ferrous wire is breaking, often plug wire, or about breakpoints, occasionally because and beverage line leakage or short circuit, etc., so the test should be very careful. The weak current testing needed to cooperate to complete;

 

4, clean lamps and lanterns of internal and external dust and garbage. Light itself will have some rubbish in use, such as residue inside the lamp bulb explosion of garbage, or other foreign minister time teach, special effects in the audience area machinery easy to fall into some rubbish, such as ribbon bar, scales, drinks the residual liquid, and so on. So be scraped clean lamps and lanterns outside of garbage and sewage, and clear the trash inside the lamp, this link need cleaning to cooperate;

 

5, check all fire protection equipment. Lighting, audio circuits is one of the most concentrated in the type of work, high voltage into the weak current, relevant equipment, related wire more, so fire is a top priority in the lights work, in the monthly routine check, should cooperate with security department, for all fire protection facility, fire fighting equipment to conduct a comprehensive inspection, monitoring scope includes the normal degree of fire-fighting equipment, fire fighting equipment choice whether normal, whether in the warranty period, etc.

 

In addition to the daily monitoring, test every week, every month comprehensive inspection, lighting engineers must know about all of the equipment and the environment is very, do please timely treatment, so as to have the good visual environment at the same time there is enough security.

【Font:Big Middle Small】【Printing this page】 【Back】【Top】【Close
CONTACT US

Service Hotline: 18922706009   Whatsapp:+8618922706009

E-mail:[email protected]
Addr.:No.2, Qinglong Dongyi Street, Dalongtou Village, Jianggao Town, Baiyun District, Guangzhou
Website: http://www.55611a.com

SHARE
粵ICP備19113232號

友情鏈接

主站蜘蛛池模板: 疯狂做受xxxx高潮视频免费| 久久久精品中文字幕麻豆发布 | 娇妻之欲海泛舟小强| 亚洲精品国产av成拍色拍| 日本视频网站在线www色| 成年视频在线播放| 亚洲欧美综合视频| 香港经典a毛片免费观看看| 小草视频免费观看| 亚洲人成在线精品| 美日韩在线视频| 国产精品香蕉在线观看不卡| 久久久噜噜噜www成人网| 爱情岛永久免费| 国产又色又爽又黄的| a毛片成人免费全部播放| а√天堂中文最新版地址bt| 亚洲乱亚洲乱少妇无码| 亚洲精品福利视频| 免费中文字幕在线国语| 国产福利免费看| 小h片在线观看| 日韩午夜伦y4480私人影院| segui久久综合精品| 久久精品一区二区三区资源网| 伊人久久大香线蕉综合电影网| 国产91精品久久| 国产精品亚洲а∨天堂2021| 天天操天天射天天色| 大帝AV在线一区二区三区| 亚洲AV永久无码一区二区三区 | 欧美视频在线播放观看免费福利资源| 国产小呦泬泬99精品| a级片免费在线| 日韩av片无码一区二区三区不卡| 亚洲黄色免费网址| 青青青国产免费一夜七次郎| 国色天香论坛社区在线视频| 久久99热精品免费观看牛牛| 欧美最猛黑人xxxx黑人猛交98| 国产yw855.c免费视频|
Service
Service