Hello, welcome to visit Guangzhou Flying Butterfly Stage Lighting Equipment Co., LTD's official website!
ENGLISH
中文
Language Selection:
TECHNICAL SUPPORT
First to understand the needs of the customers, listen to the customer with an open mind.
After-sales Service Technical Help Download News
The stage lighting equipment maintenance?
Release Date:[2016/6/24 16:50:29]   Total read [2476] Times

Light matters needing attention

 

1 and half an hour before the opening, open all equipment, low temperature preheating, test all the equipment and lines at the same time. Low temperature state refers to a dim light can;

 

2, warmed up after fifteen minutes to zero in all equipment, equipment cooling, cooling time not less than 15 minutes;

 

3, after cooling, can be formally entered the stage of music performance;

 

4, the performance, after the guests leave, lighting engineer should shut down all equipment, and make the equipment cooling 15 to 20 minutes, then equipment for storage or mask, juicers before departure.

 

Lighting equipment maintenance is more complicated than the level of sound, is trivial, basically do daily routine detection, regular weekly, monthly equipment maintenance and debugging appropriately;

 

Conventional detection range includes:

 

1, whether or not the bulb light properly;

 

2, all the devices of attachment is normal;

 

3, all the equipment whether can normal use, including light switch, color changer control, motion and so on is normal,

 

4, DMX512 signal whether can normal control lamps and lanterns;

 

5, special equipment is normal use, and fill them with the required materials, such as: machine, fog machine, snow machine, bubble machine, etc.

 

Regular testing

 

Regular testing in addition to routine monitoring all project also note the following points

 

1, in the weeks to detect when the connection to the main test equipment, including power cords, DMX512 cords, etc., and see whether there is loose, whether there is a breakpoint, etc.

 

2, when tested for weeks at the same time, should be more fully adjust the lamp and DMX512 programming;

 

Monthly equipment maintenance and proper adjustment

 

An appropriate adjustment of the every month in addition to routine monitoring and testing of all work a week, it will be a very meticulous work, need to coordinate multiple departments, such as actors, band, weak current, security, cleaning, etc., at the same time in the month test, to complete the following work.

 

1, light adjustment; Because in use there will be a part of the lamp, the change of movement or guest area lead to light changes, so in each month for the adjustment of the equipotential, of course, also include DMX512 signal control amount;

 

2, the testing of mechanical equipment, including the amount of motor, the color changer, special equipment of nozzle, etc.

 

3, check all the lines. To detect whether there is a breakpoint, breakage, leakage, because some human factors is in use to avoid lines appear all sorts of unexpected circumstances, such as ferrous wire is breaking, often plug wire, or about breakpoints, occasionally because and beverage line leakage or short circuit, etc., so the test should be very careful. The weak current testing needed to cooperate to complete;

 

4, clean lamps and lanterns of internal and external dust and garbage. Light itself will have some rubbish in use, such as residue inside the lamp bulb explosion of garbage, or other foreign minister time teach, special effects in the audience area machinery easy to fall into some rubbish, such as ribbon bar, scales, drinks the residual liquid, and so on. So be scraped clean lamps and lanterns outside of garbage and sewage, and clear the trash inside the lamp, this link need cleaning to cooperate;

 

5, check all fire protection equipment. Lighting, audio circuits is one of the most concentrated in the type of work, high voltage into the weak current, relevant equipment, related wire more, so fire is a top priority in the lights work, in the monthly routine check, should cooperate with security department, for all fire protection facility, fire fighting equipment to conduct a comprehensive inspection, monitoring scope includes the normal degree of fire-fighting equipment, fire fighting equipment choice whether normal, whether in the warranty period, etc.

 

In addition to the daily monitoring, test every week, every month comprehensive inspection, lighting engineers must know about all of the equipment and the environment is very, do please timely treatment, so as to have the good visual environment at the same time there is enough security.

【Font:Big Middle Small】【Printing this page】 【Back】【Top】【Close
CONTACT US

Service Hotline: 18922706009   Whatsapp:+8618922706009

E-mail:wfw04@163.com
Addr.:No.2, Qinglong Dongyi Street, Dalongtou Village, Jianggao Town, Baiyun District, Guangzhou
Website: http://www.55611a.com

SHARE
粵ICP備19113232號

友情鏈接

主站蜘蛛池模板: 国产乱子伦精品无码专区| 成人毛片18女人毛片免费96| 国产偷久久久精品专区| 中文字幕在线资源| 美国农夫激情在线综合| 女邻居掀开短裙让我挺进| 亚洲欧洲校园自拍都市| 黑料不打烊最新地址| 无码精品尤物一区二区三区| 免费无遮挡无码视频网站| 7777奇米四色| 日韩aa在线观看| 免费精品99久久国产综合精品| 97国产在线视频| 日韩精品在线电影| 冬日恋歌国语版20集中文版| 99精品国产丝袜在线拍国语| 最近的2019中文字幕hd| 啊灬啊灬啊灬快灬深用口述| 99在线观看视频免费精品9| 最近免费中文字幕大全 | 亚洲欧美国产精品完整版| 正在播放julia女教师| 国产精品公开免费视频| 久久久久久久99精品免费观看| 直接观看黄网站免费视频| 国产精品久久久久无码av| 久久一本精品久久精品66| 特级精品毛片免费观看| 无翼乌工口肉肉无遮挡无码18| 免费无码又爽又刺激高潮的视频| 毛片基地看看成人免费| 1314成人网| 中文字幕日韩wm二在线看 | 精品亚洲欧美无人区乱码| 97天天摸天天碰天天爽| 丰满的己婚女人| 亚洲综合校园春色| 国产乱子影视频上线免费观看| 天天看片天天操| 日本娇小xxxⅹhd成人用品|
Service
Service